Clients are requested to prepare the relevant documents before inspection, where applicable. The required documents may vary depending on the equipment type, site condition, crane configuration, inspection stage and statutory requirements.
Where applicable, please prepare:
Load chart and operation manual
Tower crane configuration details, including mast type, jib length, counterweight arrangement and wire rope specifications and reeving arrangement
PE-endorsed foundation design, Certificate of Supervision and undertaking letter
PE-endorsed wall tie design, elevation drawing and Certificate of Supervision, where wall ties are used
AE-endorsed tower crane layout plan
AE-endorsed MOM Notification Form
AE-endorsed luffing crane risk assessment with control measures (for use of luffing crane)
Risk Assessment and Safe Work Procedures for tower crane erection, use, maintenance, climbing and dismantling
Wire rope certificate / mill certificate and latest replacement or installation record
Latest inspection certificate and checklist, where applicable
Maintenance, operation and major repair / replacement records
NDT / UTG reports issued by a SAC-SINGLAS accredited testing body, with applicable acceptance criteria and crane manufacturer’s confirmation on UTG results, where applicable.
Earthing resistance test certificate, where applicable
Surveyor report / verticality or foundation level report, where applicable
Data logger brand and model, where applicable
Proof of ownership / manufacturer’s certificate for new registration, where applicable
CAAS / RSAF clearance, where applicable
Temporary Occupation Licence (TOL) or approval for oversailing outside site boundary, where applicable
Where applicable, please prepare:
Latest inspection certificate
Updated tower crane layout and elevation drawings
AE-endorsed MOM notification form, where applicable
PE-endorsed wall tie design and Certificate of Supervision, where applicable
Updated mast height, tie-back level and crane configuration details
Wire rope certificate and latest replacement / installation record
Maintenance, operation and repair records
NDT / UTG reports, where applicable
Data logger brand and model, where applicable
CAAS / RSAF clearance, where applicable
Temporary Occupation Licence (TOL) or approval for oversailing outside site boundary, where applicable
For other lifting equipment, please prepare the relevant documents where applicable:
Previous inspection certificate
Manufacturer’s manual / load chart
Equipment registration details
Maintenance and repair records
Load test records
Test load certificate, where load testing is required
Lifting gear / wire rope / chain certificate, where applicable
Structural or PE-endorsed documents for lifting beams, lifting frames, runway beams or supporting structures, where applicable
Operator / technician support for functional testing
Any supporting documents requested based on site condition or equipment type
Document requirements may vary depending on the equipment, site arrangement and inspection scope. Inspection and certification are subject to satisfactory document review, equipment condition, functional testing, load testing where applicable, and compliance with applicable statutory requirements.